Abstract
This paper present several cases in the Port of Rotterdam where both in the design and construction phase several different did not marched as expected. These cases are interesting for both the design as well the construction phase of a project. People will make mistakes however the mistakes describes in this paper have to be judged in time as not always everything was understood during the design and construction and the people of that time still these huge structures.