This site uses cookies. By continuing to use this site you agree to our use of cookies. To find out more, see our Privacy and Cookies policy.
Paper The following article is Open access

The Use of Energy in The Production Process of Hot Mix Asphalt in Asphalt Mixing Plant (AMP)

, , and

Published under licence by IOP Publishing Ltd
, , Citation A, S Atmaja et al 2021 J. Phys.: Conf. Ser. 1912 012060 DOI 10.1088/1742-6596/1912/1/012060

1742-6596/1912/1/012060

Abstract

Asphalt mixing plant (AMP) is a set of tools used to produce hot mix asphalt (HMA) in a location/place. This study is intended to determine the energy use of diesel fuel sets in the production process by measuring the energy use of both types of fuel including fuel consumption and energy, temperature, and the quantity of production from HMA in the AMP. The conclusion of this research is that changes in temperature and length of time of production will affect the use of diesel fuel and energy use, with the longer the production time and the temperature instability to heat the aggregate in the dryer, it will consume huge fuel and energy usage and the results of the calculation analysis were also obtained by producing a HMA weighing 130.640 tons requires consumption of diesel fuel of 1,477.25 liters which is equivalent to the fuel consumption of oil palm shell waste of 6.01 ton and also which is equivalent to energy use of 52,280.99 MJ, for each production of 1 ton of HMA required consumption of diesel fuel of 11.31 liters. Meanwhile, to increase 1°C requires 8.09 liters of diesel fuel consumption which is equivalent to energy use of 290.16 MJ.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.