Brought to you by:
Paper The following article is Open access

Aggregate and Disaggregate Production Planning, Material Requirement, and Capacity Requirement in PT. XYZ

, and

Published under licence by IOP Publishing Ltd
, , Citation F Lefta et al 2020 IOP Conf. Ser.: Mater. Sci. Eng. 852 012123 DOI 10.1088/1757-899X/852/1/012123

1757-899X/852/1/012123

Abstract

Good production planning which suitable for the company in fulfilling demand will increase amount of profits. PT. XYZ is a company which produce talc powder in lots of type, such as Globe 107 sterile, Globe 107 non-sterile, Globe 207 sterile, Globe 207 non-sterile, Globe 307 sterile, Globe 307 non-sterile, Globe 407 sterile, Globe 407 non- sterile, Globe 507 sterile, and Globe 507 is non-sterile. PT. XYZ problem is they can't fulfil all of their demands. Data used in this research are demand data from August 2015 until July 2019, company's cost component, and capacity of each machine used in the production process. The aim of this research is to project the next 12 months demands, determine the best lot sizing technique, and determine the capacity requirement for PT. XYZ. Based on the research, the best forecasting method is using artificial neural network, the best lot sizing technique is using AWW method with total cost Rp 2.310.465.513. The capacity problems in crusher and sterile machine are solved by implementing overtime, while in jet mill, sieve screening, and packaging can reduce their working shift.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1757-899X/852/1/012123