This site uses cookies. By continuing to use this site you agree to our use of cookies. To find out more, see our Privacy and Cookies policy.
Paper The following article is Open access

Lean Manufacturing Implementation on Extrude Process with Value Stream Maping: Study Case in Tyre Manufacture

, and

Published under licence by IOP Publishing Ltd
, , Citation Teguh Sri Ngadono et al 2020 IOP Conf. Ser.: Mater. Sci. Eng. 852 012104 DOI 10.1088/1757-899X/852/1/012104

1757-899X/852/1/012104

Abstract

Lean Manufacturing has been known by all industries as one of the strategic tools adopted to compete in the tight market competition recently. This research will be focus on implementation of lean manufacturing at the one of the biggest local tire manufactures located in Tangerang which had a problem of production achievement was 92% to the schedule planned and the main caused by shortage building due to waiting material from preparation department. Value Stream Mapping (VSM) will be used to identify the waste at extruder since 55% problems was came from extruder. The method approach by started of identifying VSM current state, Gap analysis and action plan, and the last step is identify VSM future state and review the result. From VSM Future state, its resulted the reduction of lead time process extruder from 13.72 minutes/batch to 12.8 minutes/batch and WIP stock can be reduced from 12, 8 hours to 10.6 hours. Finally the shortage at building has been reduce from 7% to 3.2% and OEE building is increasing from 61% to 64.8%.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.