Abstract
Toll Constructing a toll road project always deals with various technical and non-technical problems. Those problems are considered as the risk of construction projects. These risks will definitely affect the project function and result in losses both in terms of cost, quality, and time, which determine the success of a project. Therefore, the purpose of this research was to identify and to analyze the risks using qualitative-quantitative research with the Soft System Methodology (SSM) on Sumatra Trans Toll Road Project Section I in Bakauheni - Kalianda (Sta. 00 + 400 - Sta. 20 + 000). Collecting data, this research used purpose sampling techniques from six respondents. In addition, data analysis methods used in this study are Probability Risk Test, Consequences Risk Test, and Soft System Methodology (SSM).
Export citation and abstract BibTeX RIS
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.