Flexible flow shop scheduling problem with setup times and blocking constraint via genetic algorithm and simulation

Published under licence by IOP Publishing Ltd
, , Citation Meng Zhang 2019 IOP Conf. Ser.: Mater. Sci. Eng. 637 012007 DOI 10.1088/1757-899X/637/1/012007

1757-899X/637/1/012007

Abstract

Flexible flow shop scheduling problem (FFSP) is recognized as an important class of problems in manufacturing systems. To consider more actual production factors, such as transportation time, setup times, blocking constraint, etc., we solved the FFSP using the improved genetic algorithm (GA) and discrete event simulation (DES). Firstly, a mathematical model for FFSP with the objective of minimizing total completion time was established. Besides, a GA mixed with Palmer heuristic algorithm was proposed to solve the mathematical model. Moreover, a DES software-plant simulation-was used to establish a more realistic production model, and an actual production workshop was modeled and optimized. After optimization, the total completion time and equipment utilization were greatly improved compared with the original scheduling. It shows the effectiveness and rationality of the proposed method to solve the actual FFSP.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.