In view of the problem of inconsistent air-conditioning delivery and uneven distribution of vertical space humidity in a rocket testworkshop at a coastal launch site, this paper analyzes the cause and mechanism of the problem based on the characteristics of high space air distribution, test plant structure and air-conditioning system. And puts forward the specific measures such as adjusting high-rise space air delivery target, optimizing the air-conditioning control strategy and improving the unit's dehumidification capacity. These measures provide support for the solution of the problem and the optimal design and transformation of air-conditioning.