Paper The following article is Open access

Temporary Variables for Predicting Electricity Consumption Through Data Mining

, , , and

Published under licence by IOP Publishing Ltd
, , Citation Jesús Silva et al 2020 J. Phys.: Conf. Ser. 1432 012033 DOI 10.1088/1742-6596/1432/1/012033

This article is retracted by 2020 J. Phys.: Conf. Ser. 1432 012100

1742-6596/1432/1/012033

Abstract

In the new global and local scenario, the advent of intelligent distribution networks or Smart Grids allows real-time collection of data on the operating status of the electricity grid. Based on this availability of data, it is feasible and convenient to predict consumption in the short term, from a few hours to a week. The hypothesis of the study is that the method used to present time variables to a prediction system of electricity consumption affects the results.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1742-6596/1432/1/012033