PAPERS The following article is Open access

The use of regional advance mitigation planning (RAMP) to integrate transportation infrastructure impacts with sustainability; a perspective from the USA

, , and

Published 2 June 2014 © 2014 IOP Publishing Ltd
, , Focus on Environmental Assessments in the Built Environment Citation James H Thorne et al 2014 Environ. Res. Lett. 9 065001 DOI 10.1088/1748-9326/9/6/065001

1748-9326/9/6/065001

Abstract

Globally, urban areas are expanding, and their regional, spatially cumulative, environmental impacts from transportation projects are not typically assessed. However, incorporation of a Regional Advance Mitigation Planning (RAMP) framework can promote more effective, ecologically sound, and less expensive environmental mitigation. As a demonstration of the first phase of the RAMP framework, we assessed environmental impacts from 181 planned transportation projects in the 19 368 km2 San Francisco Bay Area. We found that 107 road and railroad projects will impact 2411–3490 ha of habitat supporting 30–43 threatened or endangered species. In addition, 1175 ha of impacts to agriculture and native vegetation are expected, as well as 125 crossings of waterways supporting anadromous fish species. The extent of these spatially cumulative impacts shows the need for a regional approach to associated environmental offsets. Many of the impacts were comprised of numerous small projects, where project-by-project mitigation would result in increased transaction costs, land costs, and lost project time. Ecological gains can be made if a regional approach is taken through the avoidance of small-sized reserves and the ability to target parcels for acquisition that fit within conservation planning designs. The methods are straightforward, and can be used in other metropolitan areas.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Introduction

Over half of all humans live in cities, (UNPF 2007) with 1.75 billion more people expected by 2030 (McDonald et al 2011). Urbanization associated with the growth of cities transforms natural landscapes and impacts biodiversity, ecosystem processes and agriculture (Theobald et al 2000, Schwartz et al 2006, Grimm et al 2008a, 2008b, McKinney 2008, Satterthwaite et al 2010). Expanding transportation infrastructure is linked to the functionality of these expanding urban areas (Barthelemy et al 2013, Schneider and Mertes 2014). However, transportation structures have adverse impacts to the natural environment (Trombulak and Frissell 2000, Forman et al 2003, National Research Council 2005), including: direct and cumulative mortality to species hit by vehicles (Seo et al 2013), reduced dispersal capacity (Forman and Alexander 1998), impediments to gene flow (Epps et al 2005), the spread of invasive species (Gelbard and Belnap 2003), the generation of greenhouse gas emissions (Fuglesvedt et al 2008, Kennedy et al 2009), and landscape fragmentation (Jaeger et al 2005, Girvetz et al 2008). Concern over the rapid growth of cities and transportation infrastructure highlights the need to reduce environmental impacts associated with this growth (Thorne et al 2005, 2006, 2009a) by initiating or improving requirements to offset those impacts via conservation or restoration of other lands, here termed environmental mitigation.

Finding a balance between new transportation infrastructure and preservation of land for biodiversity conservation, ecosystem processes, agriculture, and other needs is most effectively assessed and implemented using planning principles a regional level (Kark et al 2009, Huber et al 2010, Gordon et al 2013, Moilanen et al 2013). We used the first part of a framework called Regional Advance Mitigation Planning (RAMP, figure 1), that uses a regional planning approach to estimate the spatially cumulative impacts from multiple projects. RAMP is part of emerging practice for transportation officials in local, state, and federal government in many areas in the United States (Brown 2006, Marcucci and Jordan 2013). Using the San Francisco Bay Area as a study area, we asked, 'Can early regional assessment of impacts from multiple future transportation projects create added benefits for conservation?' We assessed potential impacts to species, habitats, agriculture and streams from 181 planned road and railroad projects. We show that the early quantification of the impacts, done in aggregate as opposed to the typical project-by-project impact assessment approach can provide the foundation for more ecologically effective and cost effective environmental mitigation strategies. We assert that the methods of the RAMP framework can be applied to many other urbanizing regions of the world.

Figure 1.

Figure 1. The RAMP framework. This framework allows the integration of environmental impact assessment and environmental mitigation (blue box) with regional conservation concerns (dotted box).

Standard image High-resolution image

Background

RAMP can be thought of as a set of guiding policies, a framework, and a method.

The policy component of RAMP emerges when government bodies make conscious decisions to use the framework to address impacts from regional transportation (or other infrastructure) development. Motivations to adopt the framework are available because RAMP addresses several known inefficiencies in the way transportation and other infrastructure projects have typically been implemented in the United States. Inefficiencies that local, state and federal government transportation agencies have historically experienced include: project-by-project environmental mitigation, usually toward the end of a project's timeline, which exposes the agencies to increased costs due to real estate appreciation, and also to losing potential land acquisition opportunities to encroaching development and speculation (Thorne et al 2006). In addition, project-by-project mitigation often overlooks regional and ecosystem scale impacts to species, habitats and ecosystem services, a recognized need in environmental impact assessment (EIA) approaches (Jay et al 2007). Further motivation arises from the possibility that bundling environmental mitigation from several projects in RAMP may permit the acquisition of fewer properties (with larger area) with consequent lower transaction and long-term land management costs, and by potentially reducing the time needed for environmental review, required under US environmental laws (Marcucci and Jordan 2013). Larger parcels are also more ecologically effective (Soule et al 2003, Gaston et al 2006), meaning a RAMP approach can be better both environmentally and economically. In support of these concepts, the US Federal Highways Administration endorses federal, state and local government applications of RAMP in transportation planning through a program called 'Eco-Logical 4 , (Brown 2006). In California, our study area's state, RAMP approaches are being used by a few individual county-level governments, and efforts to implement a state-level program are ongoing (Greer and Som 2010) 5 . A similar approach has been developed by The Nature Conservancy called 'Development by Design' that combines scientific assessment of infrastructure impacts with landscape-level conservation planning 6 .

As a framework, RAMP engages multiple parties, including transportation infrastructure developers (governmental or private), government agencies that enforce environmental laws, and research and environmental groups that have identified critical lands for conservation. This cooperation between multiple stakeholders permits the incorporation of planning principles and environmental considerations early in the development of transportation infrastructure and other construction plans and projects (Thorne et al 2009a, 2009b).

The framework used in RAMP is similar to EIA, which is an internationally recognized and often required tool for environmental management, with global (Wandersforde-Smith 1980) and regional reviews (EU: Barker and Wood 1999, Middle East and North Africa: El-Fadl and El-Fadel 2004, Brazil: Glasson and Salvador 2000). The EIA process requires proposed projects to comply with sustainable development goals. Initially EIA focused on the impacts on the natural environment. Today, and because of suggestions to give EIA a more deterministic role in planning processes (Jay et al 2007), EIA also includes impacts on the human environment (social and economic) 7 . RAMP deals with ecological and environmental concerns, as in the earlier forms of EIA.

Claims that EIA as a process was unable to include the three factors of sustainability (environmental, economic and social), and that these should be addressed earlier in the planning phase have led to the development of strategic environmental assessments (SEA, Partidário 2000). The SEA can be thought of as the counterpart to the framework component of RAMP. In Europe, the SEA framework is intended to be used to ensure that impact assessment and sustainability are accounted for during planning phases. The SEA framework advocates early EIA, and suggests that it can (1) elevate environmental concerns to the same level as other aspects of development, (2) promote multi-organizational communication and collaboration, (3) be scaled from project to region, and (4) develop codes of conduct for mitigation and compensation. To do so, the SEA framework strengthens and streamlines the EIA process by the early identification of potential impacts and cumulative effects (Partidário 2000). The SEA process has been widely applied (Chaker et al 2006, Alshuwaikhat 2005, Briffet et al 2003); however, SEA procedures are not yet fully functional because they often do not progress beyond the planning phase to implementation (Bina 2007, Wallington et al 2007). In a SEA planning phase there is a need to do spatially cumulative assessments of multiple projects (cumulative effects assessment 8 —CEA, Gunn and Noble 2011). One possible way by which SEA could progress from strategy to implementation would be through the use of a RAMP framework. RAMP's project-based impact assessments are intended to both integrate environmental information into project planning and development to potentially reduce impacts on the environment from planned transportation projects and, as a basis for identifying what regional areas could be used to compensate for the estimated impacts during environmental mitigation. This process can be implemented early in, or prior to, the implementation of the transportation projects.

The RAMP framework also provides a way to integrate funds, when those are required of road developers (governmental or private) for environmental mitigation, with regional ecological and conservation goals. This coordination between transportation development and other regional objectives can be implemented for example, by pooling environmental mitigation funds from several transportation projects, to enable the purchase of larger parcels, which produces better results for ecosystem processes, viable species populations and their habitats (Soule et al 2003, Gaston et al 2006). The ecological effectiveness of the environmental mitigation can be further enhanced by coordinating mitigation actions, such as targeting the purchase of lands for preservation, within regional conservation priorities, here called a Greenprint (figure 1).

The RAMP methods use spatial assessment tools to determine regional environmental impacts from multiple transportation projects (left-hand column of figure 1), and to coordinate the locations of environmental mitigation for those projects with regional conservation objectives. The regional impact assessment can be compared and contrasted to impacts assessed on a project-by-project basis, to determine whether a regional approach will be ecologically and economically beneficial. RAMP includes a method to project the environmental mitigation needs for each individual and the aggregate impacts; for example, by including how much area of different land cover types may be needed, and where (within the region) mitigation sites can be found for acquisition. This step requires a map of the region that portrays land that has been targeted for conservation, restoration, ecosystem services or other objectives (right-hand column of figure 1). This integration of mitigation with conservation needs can provide an opportunity for better regional outcomes for environmental and social goals. This paper demonstrates the implementation of the first part of the RAMP approach for the transportation network in the Bay Area, and discusses the utility of the approach for environmental mitigation under different contexts, including whether a RAMP approach can help link SEA and EIA.

Methods

The San Francisco Bay Area (hereafter called 'the Bay Area') region's nine-county population reached 7.15 million in 2005 from 1.73 million in 1940 (Department of Finance 2013), and is projected to grow to 10.22 million by 2050 (Public Policy Institute of California, PPIC 2009). In the Bay Area, regional government comprised of the Metropolitan Transportation Commission and the Association of Bay Area Governments (MTC and ABAG), is charged with developing a regional urban growth and transportation strategy. They published the 'Plan Bay Area' report, which identifies Bay Area transportation needs and a transportation infrastructure growth strategy over the next 25 years 9 . This report identifies 698 road and railroad transportation projects that are planned for construction in the 19 369 km2 region (figure 2). We used the first phase of a RAMP framework (figure 3) to assess the potential aggregate impacts to protected species and their habitats, and regional concerns, by assessing impacts to agricultural lands (food security and economy) and wetlands (ecosystem process).

Figure 2.

Figure 2. The nine-county San Francisco Bay region.

Standard image High-resolution image
Figure 3.

Figure 3. A flowchart of the environmental impact assessment methods used.

Standard image High-resolution image

We reviewed the 698 planned transportation projects identified in GIS files provided by the MTC, using aerial imagery (Google Maps 2013 10 ), and identified 181 road and railroad projects that crossed non-urbanized land or significant streams for inclusion in the regional impacts assessment (figure 4). Projects with predominantly urban impacts were excluded. We used ArcGIS v10 (ESRI, Redding CA) to assess aggregate environmental impacts. For each project, we identified impacts to species of concern and their habitats, to major natural vegetation types, and to agricultural lands.

Figure 4.

Figure 4. The San Francisco Bay Area planned transportation projects included in the analysis. Projects in red were analyzed to project impacts to threatened or endangered species, to landcover and agriculture, and to anadromous fish-bearing streams. Projects in yellow are in urban areas and were not analyzed.

Standard image High-resolution image

Calculation of transportation project footprints was accomplished in two ways. For new projects, the width and length of the new project was used to obtain a map of the area that may be impacted (figure 5). For modifications to existing transportation infrastructure (the majority of projects in our area), we used two buffers from the project's centerline or center point (figure 6). For the inner buffer, we used one meter square aerial imagery 11 to measure the typical distance from the centerline to the edge of the paved surface for each project. The centerline was then buffered by this distance. The second buffer is the distance from the edge of the inner buffer to the edge of the new project, which is the zone of new impact that different types of projects (e.g. adding highway lanes) will occupy when constructed (Thorne et al 2009a). The inner area was then buffered by the second distance to arrive at a total project footprint (e.g. figure 6(a)). For rail projects, we consulted an engineer from the Bay Area Rapid Transit (BART) program, to determine what the typical widths of impacts for different types of rail and terminal projects would be and applied those as buffers.

Figure 5.

Figure 5. The use of species location records with project impact footprints, to identify the extent of suitable habitat that could be impacted. Green represents potential habitat for a species. The red cross represents a known occurrence record for that species. The black outline depicts the estimated project footprint. The red dots show the area within 1.6 and 3.2 km buffers of known locations that is within a project footprint and contains potential suitable habitat. These habitat extents were summed to provide the impact projection for that species on that project.

Standard image High-resolution image
Figure 6.

Figure 6. Three individual transportation project impact assessments. Each projects extent is shown in the upper image, and the area selected by inner and outer buffers is shown in the lower image. The area inside the inner buffer depicts the existing roadway, while the outer buffer depicts the estimated new construction impacts. Projects are (a) RTP22175, (b) RTP22400, and (c) RTP240114.

Standard image High-resolution image

We then overlaid the transportation project footprints on a conservation greenprint to determine the suitable habitat that may be impacted within the project footprints (second row of figure 3). In order to develop the conservation greenprint, we compiled spatial data on the documented locations of threatened and endangered species, maps of their habitats, maps of natural landcover types and streams, and the locations of important agricultural lands. We obtained the recorded locations of threatened and endangered species that occurred within and up to eight kilometers beyond the study region from the state of California's Natural Diversity Data Base, CNDDB 12 and selected records after 1980. We used a habitat modeling approach by identifying the habitats used by each species, and developing maps of their suitable habitat from several different landcover maps. Habitats, also called vegetation types, used by California terrestrial vertebrate species are defined by a classification called the California Wildlife Habitat Relationships (CWHR), published by the California Department of Fish and Wildlife 13 . The appropriate habitats for each species were then selected from the landcover maps to portray the suitable locations for each species across our study area. For plant species, we used a similar process to identify suitable habitats, with a floristic database, Calflora 14 . Various online sources for invertebrate species were used to define appropriate habitat types. Plant and invertebrate species' habitat requirements were then linked to the CWHR types represented in the maps of the region, so that their potential locations on the landscape could be identified using the reference maps. Using the following list of landcover maps, maps of suitable habitats for every terrestrial species were developed: the Conservation Lands Network 15 , the National Wetlands Inventory 16 , the San Francisco Estuary Institute's Inventory of wetlands 17 , and the Great Valley Vernal Pool Distribution (Holland 2009).

Once the project footprints and habitat extents were established, we could measure the types of impacts and their extent. We buffered the known locations of each species by 3.2 and 6.4 (two and four miles), and selected the suitable habitat map area inside these areas (figure 5). These buffered habitat maps were then intersected with the footprints of the transportation projects to project the extent of habitat in each transportation project's footprint to be labeled as impacted-area habitats (figure 5). When the length of a transportation project extends beyond the area identified by the species buffer, there could be additional suitable habitat inside the transportation footprint, but beyond the species location buffer. Since we do not have actual evidence that the habitat is occupied, we limited the extent of suitable habitat selected to inside the species location buffers (the circles in figure 5). This makes our projections of impacts more conservative than by selecting all suitable habitat regardless of its distance from a point of known occurrence, and recognizes that not all suitable habitat for a species is occupied. Species habitat and agricultural location data were overlaid with project footprints to derive likely location and extent of impacts to species and habitats due to project construction (figure 5). Impacts were summed by species and aggregated to county and regional scales.

In addition, species-specific habitat maps for aquatic species were assembled. These included Delta smelt (Hypomesus transpacificus) and salmonid fish distribution data and critical habitat requirements from the US Fish and Wildlife Service 18 . We examined impacts to anadromous fish habitat by reviewing the number of times planned projects crossed waterways designated as critical habitat for these fish species. Typically, impacts to fish from transportation projects occur not from habitat loss but from direct mortality to individuals, especially juveniles, during the construction period itself. While temporary habitat loss on site is generally restored, additional offsite actions to mitigate for loss of individuals is usually required. Often, these actions include removal of in-channel barriers to fish movement in the vicinity of the impacts. If there are multiple impacts within a watershed, mitigation requirements and funding could conceivably be bundled for several projects, potentially leading to a greater ecological return on the mitigation investment. While the identification of aquatic mitigation locations is beyond the scope of this paper, a critical first step is the assessment of the impact locations, which we have included.

Finally, impacts to agricultural lands 19 and to some natural vegetation types (oak woodlands, riparian forest, and wetlands) were identified because these landcover types require mitigation regardless of the presence of listed species. In addition, loss of agricultural land is potentially a food security issue and reduces regional agricultural economic output; and loss of water habitats has consequences for ecosystem processes and biodiversity. For these, we calculated the full extent of impacts within the boundaries of each transportation project.

Regional versus individual project impact assessment

Typically, environmental impacts are assessed on a project-by-project basis, and subsequent mitigation to offset any impacts is also conducted on this basis. We present impact assessments from three individual projects for comparison with the regional assessment. The impacts were assessed using the same approach as for the regional assessment, and the results are also part of the summed regional results. The first project is RTP 22175, located in Santa Clara county titled, 'Widen Almaden Expressway from Coleman Avenue to Blossom Hill Road' (figure 6(a)). This project is 1.1 km in length. The assigned buffers were 12 m (existing road) and 50 m (proposed project). The second project, RTP 22400 is located in Contra Costa county titled, 'Conduct environmental and design studies to create a new alignment for SR239 and develop corridor improvements from Brentwood to Tracy—project development' (figure 6(b)). This project is 17.5 km in length, among the larger projects assessed overall. The assigned buffers were 20 m (existing road) and 152 m (proposed project). The third project is RTP 240114, located in San Mateo county titled, 'Implement operational and safety improvements on route 1 between half Moon Bay and Pacifica (includes acceleration lanes, deceleration lanes, turn lanes, bike lanes, and enhanced crossings)' (figure 6(c)). This project is 28.8 km in length. The assigned buffers were 7 m (existing road) and 15 m (proposed project).

Results

We analyzed 181 transportation projects that will cross natural lands and streams (table 1, figure 4), and found that 107 (59%) will have impacts to listed species, ecosystems, or agriculture. Of these, eight are rail and the others road projects. The aggregate rail projects' footprint area is 1551 ha as compared with 3372 ha for roads.

Table 1.  A list of the number of projects in each county and regionally. Note is a project crosses county lines, it is counted in each county where it occurs.

Region or type of project Number of projects listed in MTC report Number of projects included in analysis Projected total costs for selected projects (in millions)
Bay Area region/multi-county 72 20 $5882
Alameda county 117 36 $4752
Contra Costa county 106 39 $2158
Marin county 29 a
Napa county 20 15 $299
San Francisco county 54 a
San Mateo county 58 15 $733
Santa Clara county 155 33 $10 989
Solano county 46 10 $989
Sonoma county 31 13 $614

aFor these counties only regional projects were included in the analysis.

The estimated impacts from the 107 projects include 43 terrestrial threatened and/or endangered species were recorded within 6.4 km of the project extents, and 30 within 3.2 km (table 2), including 20 plant species, seven birds, five amphibians and reptiles, four insects, two mammals, and four aquatic invertebrates. Impacted species were affected by an average of 8.4 projects using the 6.4 km buffer and 6.4 projects using the 3.2 km buffer (table 2).

Table 2.  Area impacts by species habitat from transportation projects (hectares).

Area impacts by species habitat   Impacts—3.2 km (in hectares) Impacts—6.4 km No. projects—3.2 km No. projects—6.4 km
Acanthomintha duttonii San Mateo thorn-mint 1.66 2.75 2 3
Agelaius tricolor Tricolored blackbird 278.2 552.36 23 32
Ambystoma californiense California tiger salamander 474.21 509.38 38 44
Amsinckia grandiflora Large-flowered fiddleneck 8.54 19.8 1 3
Athene cunicularia Burrowing owl 344.4 493.5 41 53
Blennosperma bakeri Sonoma sunshine 7.7 7.7 1 1
Branchinecta conservatio Conservancy fairy shrimp 0.73 13.4 1 1
Branchinecta longiantenna Longhorn fairy shrimp 0.0 1.5 3
Branchinecta lynchi Vernal pool fairy shrimp 41.8 41.8 6 6
Buteo swainsoni Swainson's hawk 324.4 559.5 20 23
Callophrys mossii bayensis San Bruno elfin butterfly 6.1 7.6 3 3
Castilleja affinis ssp. neglecta Tiburon paintbrush 1.6 25.2 2 9
Ceanothus ferrisiae Coyote ceanothus 0.0 0.04 1
Chloropyron molle ssp. molle Soft bird's-beak 0.0 <0.01 1
Chloropyron palmatum Palmate-bracted bird's-beak 2.2 7.9 3 7
Cirsium fontinale var. fontinale Fountain thistle 0.0 <0.01 1
Dudleya abramsii ssp. setchellii Santa Clara valley dudleya 0.04 0.04 1 1
Elaphrus viridis Delta green ground beetle 0.0 6.8 1
Eriophyllum latilobum San Mateo woolly sunflower 0.0 0.45 1 2
Eryngium racemosum Delta button-celery 0.0 3.36 1
Hesperolinon congestum Marin western flax 0.08 0.08 1 1
Lasthenia burkei Burke's goldfields 0.0 0.04 1
Lasthenia conjugens Contra Costa goldfields 21.5 21.5 2 2
Laterallus jamaicensis coturniculus California black rail 43.1 45.9 12 21
Lepidurus packardi Vernal pool tadpole shrimp 15.4 21.5 2 2
Limnanthes vinculans Sebastopol meadowfoam 0.0 0.12 2
Masticophis lateralis euryxanthus Alameda whipsnake 0.0 0.32 1
Navarretia leucocephala ssp. plieantha Many-flowered navarretia 5.9 7.4 1 1
Plebejus icarioides missionensis Mission blue butterfly 5.5 6.4 2 3
Pleuropogon hooverianus North Coast semaphore grass 0.0 0.04 1
Potentilla hickmanii Hickman's cinquefoil 0.16 0.24 1 1
Rallus longirostris obsoletus California clapper rail 121.3 215.3 19 25
Rana draytonii California red-legged frog 250.9 345.9 42 51
Reithrodontomys raviventris Salt-marsh harvest mouse 10.9 19.7 7 7
Riparia riparia Bank swallow 0.0 0.16 1
Speyeria callippe callippe Callippe silverspot butterfly 0.0 5.6 2
Sternula antillarum browni California least tern 0.24 6.5 1 5
Streptanthus albidus ssp. albidus Metcalf Canyon jewel-flower 0.04 0.04 1 1
Suaeda californica California seablite 5.02 5.3 1 1
Thamnophis gigas Giant garter snake 0.0 0.24 1
Thamnophis sirtalis tetrataenia San Francisco garter snake 3.68 7.28 3 6
Trifolium amoenum Showy rancheria clover 0.65 10.08 4 6
Vulpes macrotis mutica San Joaquin kit fox 249.9 332.41 15 25
Total species impacts 2411.4 3490.2 107 107

Seventy seven projects were projected to have 990 ha of direct landcover impacts to farmland, 17 projects impacted 13 ha of riparian vegetation, 19 projects impacted 37 ha of oak woodlands, 36 projects impacted 70 ha of wetlands, eight projects impacted 50 ha of vernal pools, and 16 projects impacted 16 ha of open water, totaling 1175 ha of landcover impacts.

Fifty eight projects contained 125 stream crossings that may affect four categories of threatened or endangered salmonid fish: Chinook salmon (Oncorhynchus tshawytscha), and steelhead (Oncorhynchus mykiss), which come from three evolutionarily significant units, the Central Coast, Central Valley and South-central coast, representing uniquely composed genetic subpopulations (Busby et al 1996).

Regional versus individual project impact assessment

Of the 43 threatened or endangered species, 58% are projected to be impacted by more than one project. Taking examples by taxonomic group and using the smaller (more conservative) buffer analysis, we find that: Rana draytonii (California red-legged frog) habitat is found in 42 projects, with habitat impacts ranging from 0.02–72 ha; Athene cunicularia (burrowing owl) habitat is found in 41 projects with habitat impacts ranging from 0.04–119.3 ha per project; Vulpes macrotis mutica (San Joaquin kit fox) habitat is found in 15 projects with habitat impacts of 0.03–163 ha per project; Branchinecta lynchi (vernal pool fairy shrimp, that lives in seasonal wetlands) habitat is found in six projects with habitat impacts ranging from 0.16–20.9 ha per project; and, Castilleja affinis ssp. neglecta (Tiburon paintbrush) is found in two projects for >0.01 and 1.6 ha extent of habitat impacts.

To compare regional impacts to those by project, we used the three example projects. Twelve threatened or endangered species are expected to have habitat impacted from at least one of the three individual projects (table 3). Some very limited-distribution species, such as Potentilla hickmanii or B. lynchi, only appear in the analysis for these three projects. However 83% of impacted species from the three projects are also impacted by other projects. The large single example project, TRP 22400, impacts eight species, one uniquely, and contributes between 35–65.3% of the habitat impacted for the other seven to the regional total. Habitat for these seven species is also impacted by from 1–53 other projects. Similarly, all of the major ecosystems impacted by the three projects (table 3) are also impacted by between five and 74 other planned projects.

Table 3.  The projected area of suitable habitat impacted (ha) within the buffered footprints for the three example projects, listed by their project identification number.

Species Project 22175 (ha) Project 22400 (ha) Project 240114 (ha)
California red-legged frog 0.0–4.17 71.99–73.69 15.5
Tricolored blackbird 146.8–312.9
California tiger salamander 164.38
Burrowing owl 119.9–163.3
Vernal pool fairy shrimp 18.6
Swainson's hawk 208.78–350.58
Delta button-celery 0.0–3.4
San Joaquin kit fox 163.3
San Bruno elfin butterfly 5.63–6.07
Mission blue butterfly 0.0–0.85
Hickman's cinquefoil 0.16–0.24
San Francisco garter snake 2.75–3.76
Open water <0.04 0.16
Wetlands 0.12 3.92 0.24
Oaks 0.12
Riparian forest 0.08
Farmland 278.3 5.58
Vernal pools 1.86

Discussion

Regional and project level assessments

Nearly 24% (1175 ha) of the planned transportation projects analyzed in the Bay Area are projected to impact landcover types that require mitigation in California. Additionally, there are spatially cumulative impacts to habitats that support between 30 and 43 threatened and endangered species, totaling between 2411–3480 ha. Over half of these species will be impacted by more than one project. The environmental mitigation for these spatially cumulative, regional impacts will likely require considerable open space (>30 km2). In contrast, the project-by-project analysis indicated only minor impacts to species and habitats (three to four orders of magnitude smaller). For example, burrowing owls (A. cunicularia) are expected to have 344–494 ha of habitat impacted by 41–53 projects. Project-by-project mitigation for this species would yield a myriad of small, potentially poorly performing habitat reserves. Combining the mitigation solutions from the projects impacting this species could greatly reduce the number of individual land acquisition transactions required (with associated cost and time savings), and yield larger, potentially better functioning reserves. Additionally, the aggregate loss of nearly 10 km2 of farmland to 77 projects, and 70 ha of wetlands to 36 projects shows how expansion consumes landcover types which provide important ecosystem services such as food and water retention. By considering the spatially aggregate impacts to landcover types, it may be possible to put larger blocks of remaining lands under conservation management which would protect them from conversion, and assist in provisioning the region with an important base of ecosystem services. These results show there are compelling reasons to consider the impacts from a spatially cumulative perspective, which offer the possibility to conduct better environmental practice. Government regulatory representatives will find environmental mitigation better meeting the needs of species, and transportation agencies will potentially find economic savings through the purchase of fewer, larger properties, as well as recognition for improvement in environmental practice.

The use of a RAMP framework for providing compensatory mitigation for transportation projects appears justified because of the large number of projects and the extent of the expected impacts. Further, the mitigation required by government environmental regulation agencies to permit the development of these projects will likely be more than just the area of direct impacts we quantified. Regulatory agencies often require multipliers for impacts to calculate mitigation needs. These multipliers vary by the type of impact and the ecological context, with (in the US) no net loss laws requiring a minimum of 1 ha of wetlands constructed for every 1 ha developed, and typically additional extant wetlands protected (US Clean Water Act 1972 20 ). In California, many habitat types for endangered species may require a higher ratio. For example, blue oak woodlands (Quercus douglassii) are frequently assessed at a 3:1 ratio, whereby three hectares must be purchased or restored for each hectare impacted.

The development of regional EIAs, and subsequent identification of appropriate locations to accommodate the environmental offsets, is at the heart of California's RAMP framework. An interesting phenomenon is that groups using the approach are emerging at several spatial scales and administrative levels, such as federal initiatives advanced through Eco-logical (Brown 2006) and two county-level initiatives in California. One measure of success of the approach is where conservation lands have actually been acquired to offset transportation infrastructure impacts, in other words by the completion of the RAMP steps. The two county-level initiatives in California are doing this to offset spatially cumulative impacts from multiple transportation projects well in advance of transportation project delivery. San Diego county has a program that uses funds from a county sales tax measure to pay for offsets from transportation project impacts 21 , while Orange county (near Los Angeles) has acquired at least four properties to address similar impacts, also funded through a county sales tax measure 22 . This suggests the utility of the approach, and that it would be possible to implement it elsewhere, even while other areas have different environmental laws, administrative systems and capacities.

RAMP and SEA

The implementation of RAMP in some counties in California, the results from the Bay Area impact assessment, and the national guidelines promoting a RAMP framework may be informative for European groups that are attempting to implement SEAs. The challenge for the EU has been how to implement spatially cumulative effect assessments (CEAs) which are the phase of a SEA where implementation occurs. The RAMP framework shows one way that this integration of planning, environmental impact analysis, project construction and environmental mitigation can be operationalized. While the specifics of environmental laws, business practice, and environmental practice differ between the EU and the US, the underlying needs and challenges are the same.

This study illustrates how RAMP could act as the operationalization tool to bring SEA from a strategic to an implementation level. We show that RAMP addresses spatially cumulative impacts (for example cumulative impacts on California red-legged frogs and burrowing owl, for which project-specific impacts are much smaller than those of the RAMP spatially cumulative estimated impacts). We also demonstrate that RAMP is more than that. It can be the step at a regional level that is necessary to bridge between the planning level of SEA and the project-by-project level of an EIA. In the Bay Area assessment, we show that 58% of the threatened and endangered species are projected to be impacted by more than one project. Thus, the scaling from individual to multiple project assessments of impact for those species allows for a regional planning of mitigation and compensation measures, likely more effective than project-by-project planning from both a transportation delivery and ecological perspective. RAMP can thus be coupled with the assessment of mitigation and compensation needs (how much is required from the sum of all projects); it can be used in partnership with systematic conservation planning tools for conservation land identification (where best can we meet those requirements); and because of this regional perspective, RAMP can identify the best strategy for conservation land acquisition and designation (how to best use mitigation funds to acquire land for conservation).

RAMP in other metropolitan regions

The population growth projections in the Bay Area (PPIC 2009), and for cities globally, (McDonald et al 2011) suggest that cities will continue to expand. Further, the urban extent in the Bay Area has expanded by over 1842 km2 since 1940, as population grew from 1.7 to 7.1 million (Thorne et al 2013), trends that are similar to hundreds of other cities globally, where populations have on average doubled and area used has tripled (Schneider and Mertes 2014) or quadrupled over the past 20 years (Deto et al 2011). The pressures these trends and associated transportation infrastructure will put on natural ecosystems suggest the need is urgent, and that a RAMP framework may be an attractive option for planners in other metropolitan regions who seek better outcomes for conservation and infrastructure development. Infrastructure agencies are a promising group for environmental groups to work with to initiate this type of planning because of their long planning horizons (Thorne et al 2009b), and it is hoped that by setting an example, these agencies may also be able to influence environmental mitigation practices from other types of urban growth impacts, particularly housing construction. The Bay Area implementation of the RAMP framework will need to involve multiple jurisdictions, which may be typical of what would be encountered in other metropolitan regions.

In many developing countries there are fewer legal obligations for environmental offsets (Kuokkanan 2002), and in many cases, less digital data are available about the locations of the resources and species of concern. In such areas, a RAMP approach could potentially still be useful as a way to develop regional planning. First, its use would require an evaluation of the data that are lacking to conduct an EIA of a road network, which could provide government and environmental NGOs with an agenda about what type of information is needed to be developed. Second, even without specific information on the locations of species, impacts to landscape connectivity, to linear features such as rivers, and to the general landcover types, as identified by coarse-resolution landcover maps (for example, the CORINE program from the European Environmental Agency, or MODIS products), can be assessed. The RAMP approach can even be applied in regions that have very little data or capacity, through recognition that the development of road networks has spatially cumulative impacts. This recognition can provide the basis to develop partnerships between those responsible for the implementation of roads, and those with the knowledge and expertise to assess what impacts might arise.

RAMP shortcomings/limitations

Barriers to the application of a complete RAMP framework include data and knowledge, skills and capacity building, institutional configurations and legislative power. Like SEA (João 2007), RAMP can be a data hungry platform and the spatial extent of RAMP projects needs to be defined, to understand the issues that are at stake. This data need is exacerbated by the assessment of cumulative effects (Therivel and Ross 2007) and the across-scales interactions emerging from this regional approach (Partidário 2007). Local or federal governments, universities, and NGOs are the primary repositories of such data and knowledge, and need to be engaged in the process. Some federal US agencies are interested in putting these data online to promote this type of planning, for example, the US Federal Highways ESA WebTool 23 , and the Environmental Protection Agency's NEPAssist tool 24 . However, such tools are relatively new, are not populated with data or the data are incomplete depending on the state, or are not yet widely available.

The RAMP framework requires some investment in planning and design that is typically earlier in the cycle of project development than is the case under business as usual. Therefore, a key consideration for convincing regional governments to adopt the approach is to demonstrate that there are enough biological and environmental impacts from new infrastructure projects to justify implementing a regional environmental mitigation, by identifying suitable environmental offsets to satisfy obligations from multiple projects. This can be hindered by institutional configurations and legislative power. Institutions have agendas of their own and clear jurisdictional boundaries necessary to track accountability in decisions. Cross-institutional collaboration is rare, but RAMP provides a framework for involvement of multiple stakeholders in the planning process, wherein each group has something to gain through the collaboration. The challenge ahead is how to promote institutional configurations that allow for collaboration while preserving accountability. Different agencies comply differently to legislation and regulation at different governance levels (for example international conventions like the Ramsar convention, US national laws like the Endangered Species Act, or local policies like the California Lands Act). The lack of environmental regulation need not to be a barrier to RAMP, as a code of best conduct can be implemented, or NGOs can play a significant role in managing environmental needs.

Conclusion

This analysis demonstrated the screening of 698 transportation projects in a major metropolitan area to identify 181 that cross open space, and found that 107 of those will have cumulative biological and environmental impacts of 3586–4655 ha. These impacts will affect at least 30 threatened or endangered species, over half of which will be impacted by more than one project. These results point to the need to address the environmental mitigation for these impacts in aggregate. The RAMP framework offers an opportunity to do so, with potential for better ecological results, and that the implementation may be less expensive than project-by-project mitigation. In the Bay Area, assembling a round table of transportation agency and environmental regulation agency representatives will permit discussion of steps for implementation of a RAMP. In other parts of the world, the RAMP framework offers a model for development of cooperative regional planning that can result in better environmental outcomes.

Acknowledgments

We acknowledge the Gordon and Betty Moore Foundation for funding. We thank the Metropolitan Transportation Commission and the Bay Area Congestion Management Agencies for their support in data collection. We thank Paul Medved (BART) for providing information about rail transportation development and impacts.