Load Shedding Simulation Using A Frequency Relay In Lampung Electrical System

, and

Published under licence by IOP Publishing Ltd
, , Citation I Darmana et al 2020 IOP Conf. Ser.: Mater. Sci. Eng. 990 012005 DOI 10.1088/1757-899X/990/1/012005

1757-899X/990/1/012005

Abstract

Stability is one of the requirements of an electrical power system which can be considered good/ideal, One disturbance that can affect stability is the outage of the system generator. To overcome this problem, load shedding is performed, The load is released in a simulation aimed at bringing the frequency back to the authorized value after the disturbance has occurred. The power plant that experienced a trip in this study was the largest Lampung unit of the generator Tarahan 4. When the generator Tarahan 4 has been tripped, the frequency system is falls and stabilize at 48.8 Hz. Thereforeits necessary to release the load so that the system frequency returns to the authorized value, which is from 49,8 Hz to 50.2 Hz. Based on the results of simulation after setting the frequency relay, by releasing a load of 152.2 MW, the frequency was stable at 50.074 Hz. So it can be concluded that the frequency relay setting has been able to return the system frequency to allowable value.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1757-899X/990/1/012005