Paper The following article is Open access

Performance analysis of TPM implementation through Overall Equipment Effectiveness (OEE) and Six Big Losses

, and

Published under licence by IOP Publishing Ltd
, , Citation A P Herry et al 2018 IOP Conf. Ser.: Mater. Sci. Eng. 453 012061 DOI 10.1088/1757-899X/453/1/012061

1757-899X/453/1/012061

Abstract

PT. TMI is a company engaged in the field of automotive that has implemented Total Productive Maintenance to improve efficiency and effectiveness of manufacturing companies as a whole. But it turns out that targets that are not achieved still often occur due to engine trouble. This study aims to determine the maintenance system of Press 2A machine that has a high rate of decline in speed. This study begins by measuring the achievement of Overall Equipment Effectiveness (OEE) value by first calculating the Availability, Performance Rate and Rate of Quality, then identifying the Six Big Losses that occur. The results showed that the average value of OEE on 2A Stamping machine is 70%, the effectiveness value is moderate and still below the standard of OEE value for world class company that is 85%. While the factor of Six Big Losses most influential on the low effectiveness of Press 2A machine is Reduced Speed Loss with total loss for a year of 56.411 minutes or 53% of all losses.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.