Abstract
In the power system, the phase-check is a simple but very important work. The newly built, transformed and expanded power plant, transformer substation electrical equipment and power transmission lines before put into operation must be carried out phase-check test, in order to ensure voltage phase sequence and phase correct. At present, there are some limitations of traditional phase-check technology in China. In this paper, we study the method of unified reference source based on synchronized phasor measurement technology. Through the GPS time synchronization signal to realize synchronous sampling of source voltage signal in different regions, by comparing to the phase of a fixed reference source signal in the power network to determine the phase relationship between any two different power points, and thus to complete the work of phase-check. The unified reference source phase-check method based on the synchronized phasor measurement technique is simple, easy to operate, and has high efficiency, which has unique advantages. And wide area power grid phase-check can be realized.
Export citation and abstract BibTeX RIS
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.