Abstract
In order to explore operation scheme of downstream controlling reservoir in water source area for optimized allocation of inter-basin water resources, this paper selected the south-to-north water diversion middle route project in Hanjiang River basin as an instance. The optimized dispatching mode of Danjiangkou Reservoir is built with multiple dispatching objective functions and different dispatching scenarios set, such as maximum water supply during water supply period, minimum discharge, minimum abandoned water and maximum power generation. The simulation results indicate that the model and methods proposed in this paper are feasible and effective.