Abstract
In the transformation process of data integration network, the impact on the business has always been the most important reference factor to measure the quality of network transformation. With the importance of the data network carrying business, we must put forward specific design proposals during the transformation, and conduct a large number of demonstration and practice to ensure that the transformation program meets the requirements of the enterprise data network. This paper mainly demonstrates the scheme of over-migrating point-to-point access equipment in the reconstruction project of power data comprehensive network to migrate the BGP autonomous domain to the specified domain defined in the industrial standard, and to smooth the intranet OSPF protocol Migration into ISIS agreement. Through the optimization design, eventually making electric power data network performance was improved on traffic forwarding, traffic forwarding path optimized, extensibility, get larger, lower risk of potential loop, the network stability was improved, and operational cost savings, etc.
Export citation and abstract BibTeX RIS
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.