Abstract
This study discuss 24-hours load scheduling to get the minimum generation cost. Fuel cost in load scheduling need to be considered, because fuel and power suppliers are bound by take or pay schedule. In addition load scheduling considering heat rate, start-up cost, minimum up time and minimum down time. Load scheduling calculate by priority list method that is completed using artificial intelligence, Binary Particle Swarm Optimization (BPSO). The data used in this study is IEEE 30 bus and Java-Bali 500 kV.
Export citation and abstract BibTeX RIS
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.