Abstract

The vacuum preloading will produce an effect of tension fracture on existing road. We have established the mechanical model of vacuum preloading in vacuum preloading zone by using FLAC3D software and analyze the influence of the supporting structure, which is the high pressure jet grouting pile. The influential area of vacuum preloading with the high pressure jet grouting pile of the expressway is 20 meters and the largest settlement is 2.24 centimeters. Obviously, the high pressure jet grouting pile can weaken the influence of vacuum preloading on the expressway obviously more.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1755-1315/81/1/012174