Paper The following article is Open access

Real time cost control algorithm of complex construction project based on BIM

, and

Published under licence by IOP Publishing Ltd
, , Citation Lili Zhang et al 2021 IOP Conf. Ser.: Earth Environ. Sci. 760 012018 DOI 10.1088/1755-1315/760/1/012018

1755-1315/760/1/012018

Abstract

The existing project cost control algorithms do not consider the task coupling characteristics in the project cost, and the calculation is easily affected by the coupling, resulting in a large mean square error. Therefore, a BIM based real-time control algorithm for complex construction cost is proposed. Firstly, BIM method is used to optimize the allocation of engineering resources. Secondly, considering the coupling of tasks in project cost, demand side management structure is used to decouple. Then, the equivalent approximate control model is established to calculate the cost factors to realize the cost control of the project. In order to verify the feasibility of the design algorithm, the simulation results show that the control response of the design algorithm is higher, and the root mean square error is lower, which meets the original intention of the design.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1755-1315/760/1/012018