Paper The following article is Open access

Analysis of Generating Pico Hydro Power Plants (PLTPH) Case Study: Reservoir E Institut Teknologi Sumatera

, , and

Published under licence by IOP Publishing Ltd
, , Citation Dean Corio et al 2020 IOP Conf. Ser.: Earth Environ. Sci. 537 012029 DOI 10.1088/1755-1315/537/1/012029

1755-1315/537/1/012029

Abstract

The mission of the Institut Teknologi Sumatera (ITERA) is to contribute to the empowerment of the potential that exists in the Sumatra region. In line with this mission, in an effort to support the acceleration of renewable energy growth in Sumatra, labor needs to be prepared that can be used directly by students to prove theory in class, one of which is a hydroelectric power plant, with a small capacity (pico hydro) with the use of ITERA reservoir water. This paper will discuss the design of a pico hydro power plant that matches the conditions of the ITERA reservoir by modeling using Matlab / Simulink. The simulation results with a 5.46 meter head and a 0.4 m3 / s discharge obtained a power of 12.61 kW.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1755-1315/537/1/012029