Gejayan intersection is located in Sleman Regency of Yogyakarta. Fly Over will be constructed at the intersection in the ring road of Yogyakarta. The nearest intersection to the east is Gejayan Intersection with a distance of 1573.11 meters. Gejayan intersection performance in 2018 has reached saturation by having Level of Service E. The more severe conditions will occur in the next 10-20 years. If it is planned using Fly Over on the ring road in Yogyakarta connecting Gejayan intersection, the vehicles flow must have other alternative by road widening. The most important step is to predict the Vehicle Operating Costs (VOC). After the Fly Over operation, VOC can be calculated to determine the cost saving. The scenario to predict VOC was 80% of vehicle volume would pass the Fly Over, and the 20% would still use the existing road. The results showed that the cost saving of Vehicle Operating Costs (VOC) of the existing road compared to the fly over use in 2019 was IDR 37,941,324,952. In 2039 the saving would be IDR 240,232,694,488. If the road was only widened, the cost saving of VOC in 2019 would be IDR 9,084,204923 and in 2039 would be IDR 72,107,188,198.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1755-1315/340/1/012036