This site uses cookies. By continuing to use this site you agree to our use of cookies. To find out more, see our Privacy and Cookies policy.
Paper The following article is Open access

Construction simulation of middle column of prefabricated box girder bridge in prefabrication stage

, , and

Published under licence by IOP Publishing Ltd
, , Citation JiangWei Kang et al 2021 J. Phys.: Conf. Ser. 2044 012201 DOI 10.1088/1742-6596/2044/1/012201

1742-6596/2044/1/012201

Abstract

Through the finite element software abaqus, the finite element model of prefabricated segmental box girder with one joint and three spans(42m+66m+ 42m)in the section from the airport expressway to XinZheng is established. It is demonstrated that the stress of the box girder and the stress between joints are in the safe range during the symmetrical splicing construction of middle piers. By changing the value of the pre-stress, the influence of pre-stress on the mechanical performance of the box girder in the construction stage is discussed.As a result, during the construction process, the roof pre-stress has a bigger impact on the construction stage than the web pre-stress, and it is proposed that the loss of pre-stress should be reduced during the construction stage.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1742-6596/2044/1/012201