Abstract
Deep foundation pit excavation not only faces complex hydro-geological and engineering geological conditions, but also meets many unknown engineering risks. Deep foundation pit excavation not only faces complex hydro-geological and engineering geological conditions, but also needs to make full use of BP nerve network. Based on this, this paper first analyzes the connotation and function of BP nerve network, then studies the simulation of deep foundation pit construction earthwork excavation, and finally gives the BP nerve network simulation and optimization method of deep foundation pit construction earthwork excavation.