Abstract
In this paper we shed light on the issue of scheduling a single machine for foggy delay time and foggy work time. For the purpose of reducing the value of maximizing blur-delay function. A comparison was made and tested between several local methods ((TA), (TS), (GA), (ACO) and (MA)). The results of the selection reached 1500 works. Through the results, it was found that ACO gives the best approximate solutions.
Export citation and abstract BibTeX RIS
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.