Abstract
In view of the imbalance and even the abnormal phenomenon of reactive circulation of parallel high voltage transmission lines with similar measured parameters in actual operation, combined with field investigation and test, theoretical analysis and simulation demonstration, it is clear that this phenomenon is caused by the use of unconventional phase sequence and unreasonable transposition of the two-circuit lines when erecting the same tower. Based on the PSCAD simulation, the corresponding improvement measures are put forward from two aspects of optimizing the arrangement of phases and transposition. The results show that in order to solve the power imbalance problem of parallel coupled transmission lines, it is recommended to optimize the phase sequence of conductors in consideration of economy and operability.
Export citation and abstract BibTeX RIS
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.