Abstract
Several sports in the XVIII Asian Games will be held in Palembang city in 2018. To support activities and facilities it is necessary to support such buildings as Light Rail Transit (LRT). The city government of Palembang targets LRT construction to operate in June 2018 with a total length of 23.4 km and a 12 meter LRT road width for two lines. PT. Waskita Karya (Persero) Tbk as the implementation of LRT project development. In an effort to prevent or reduce accidents on the required development an occupational safety and health program (K3). The purpose of this study is to calculate the frequency and impact of OHS risk on the Light Rail Transit (LRT) project in Palembang. This research uses field observation and interview method, and conducting assessment based on risk assessment matrix from AS / NZS 4360: 2004 risk management standard. Matrix risk assessment methods derived from Australian Standards / New Zaeland Standards (AS / NZS) 4360: 2004 and ISO 31000: 2009. From 60 variables that have been tested previously obtained 78 factors in group L (low), 18 factors in the group Medium (M) and as many as 4 factors in group H (high).
Export citation and abstract BibTeX RIS
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.