Optimization Research on Ampacity of Underground High Voltage Cable Based on Interior Point Method

and

Published under licence by IOP Publishing Ltd
, , Citation Feng Huang and Jing Li 2017 IOP Conf. Ser.: Mater. Sci. Eng. 274 012123 DOI 10.1088/1757-899X/274/1/012123

1757-899X/274/1/012123

Abstract

The conservative operation method which takes unified current-carrying capacity as maximum load current can't make full use of the overall power transmission capacity of the cable. It's not the optimal operation state for the cable cluster. In order to improve the transmission capacity of underground cables in cluster, this paper regards the maximum overall load current as the objective function and the temperature of any cables lower than maximum permissible temperature as constraint condition. The interior point method which is very effective for nonlinear problem is put forward to solve the extreme value of the problem and determine the optimal operating current of each loop. The results show that the optimal solutions obtained with the purposed method is able to increase the total load current about 5%. It greatly improves the economic performance of the cable cluster.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.