Abstract

Total Productive Maintenance (TPM) strategy includes group of activities and actions in order to maintenance machines in failure-free state and without breakdowns thanks to tending limitation of failures, non-planned shutdowns, lacks and non-planned service of machines. These actions are ordered to increase effectiveness of utilization of possessed devices and machines in company. Very significant element of this strategy is connection of technical actions with changes in their perception by employees. Whereas fundamental aim of introduction this strategy is improvement of economic efficiency of enterprise. Increasing competition and necessity of reduction of production costs causes that also mining enterprises are forced to introduce this strategy. In the paper examples of use of OEE model for quantitative evaluation of selected mining devices were presented. OEE model is quantitative tool of TPM strategy and can be the base for further works connected with its introduction. OEE indicator is the product of three components which include availability and performance of the studied machine and the quality of the obtained product. The paper presents the results of the effectiveness analysis of the use of a set of mining machines included in the longwall system, which is the first and most important link in the technological line of coal production. The set of analyzed machines included the longwall shearer, armored face conveyor and cruscher. From a reliability point of view, the analyzed set of machines is a system that is characterized by the serial structure. The analysis was based on data recorded by the industrial automation system used in the mines. This method of data acquisition ensured their high credibility and a full time synchronization. Conclusions from the research and analyses should be used to reduce breakdowns, failures and unplanned downtime, increase performance and improve production quality.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1755-1315/95/4/042019