Abstract
Based on a certain threshold to ensure the durability of structure, the concrete-lined steel pressure pipes used in the structure of large hydropower station widely are allowed to exist in concrete cracking under the action of a certain hydraulic pressure. According to the 1:2 large scale experiment model and the measured data of Three Gorges Hydro-power Station, the existing different methods for calculating crack width were compared and improvements and crack control measures were raised.