Abstract

The foundation of Hongyun building B tower is made of raft board foundation which is 3300mm in the thickness concreted pouring amount of large and the late poured band in the pouring settlement formed. The temperature of the pouring settlement was controlled in order to prevent the crack of the construction of the late poured band. The steel of post pouring band was designed and monitorred. The quality of post pouring band quality is guaranteed in the raft concrete foundation of Hongyun Building B tower.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1755-1315/81/1/012122