The mechanism of two-criteria optimization for the resource planning problem is proposed, where the formalization of the problem can be represented by the direct and inverse control problem with a structurally similar description of the objective and cost functions. The set of Pareto-solutions of the two-criteria problem is determined by solution of the direct and inverse problems by the method of dichotomous programming, and the optimum on the set of Pareto-solutions – by the mechanism of complex estimation.