Semi top-down method combined with earth-bank, an effective method for basement construction.

and

Published under licence by IOP Publishing Ltd
, , Citation B Q Tuan and Ng M Tam 2018 IOP Conf. Ser.: Earth Environ. Sci. 143 012047 DOI 10.1088/1755-1315/143/1/012047

1755-1315/143/1/012047

Abstract

Choosing an appropriate method of deep excavation not only plays a decisive role in technical success, but also in economics of the construction project. Presently, we mainly base on to key methods: "Bottom-up" and "Top-down" construction method. Right now, this paper presents an another method of construction that is "Semi Top-down method combining with earth-bank" in order to take the advantages and limit the weakness of the above methods. The Bottom-up method was improved by using the earth-bank to stabilize retaining walls instead of the bracing steel struts. The Top-down method was improved by using the open cut method for the half of the earthwork quantities.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.