Development of a Semi-submersible Barge for the installation of a TLP floating substructure. TLPWIND® case study

, and

Published under licence by IOP Publishing Ltd
, , Citation Juan Amate et al 2016 J. Phys.: Conf. Ser. 749 012016 DOI 10.1088/1742-6596/749/1/012016

1742-6596/749/1/012016

Abstract

One of the biggest challenges to introduce Tension Leg Platform (TLP) technology into the Offshore Wind market are the Transport & Installation (T&I) stages, since most of TLPs are not self-stable as semisubmersible or SPAR platforms, and consequently requires additional means to perform these operations. This paper addresses this problem that has been overcome through the development of a Semi-submersible "Transport & Installation" Barge (SSB) for Iberdrola's TLPWIND® floating support structure. The Semi-submersible Barge has been designed both through the use of numerical models and an extensive basin testing campaign carried out at the University of Strathclyde facilities. This paper also includes an estimation of the duration in time to carry out the installation process of a Floating Offshore Wind Farm, comprising 100x5MW TLPWIND® units in different scenarios.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.