Critical mechanical structure of superconducting high current coils for fast ramped accelerator magnets with high repetition rates in long term operation

, , , , and

Published under licence by IOP Publishing Ltd
, , Citation E Fischer et al 2010 J. Phys.: Conf. Ser. 234 032013 DOI 10.1088/1742-6596/234/3/032013

1742-6596/234/3/032013

Abstract

The heavy ion synchrotron SIS100 is the core component of the Facility for Antiproton and Ion Research (FAIR) currently under construction at GSI in Darmstadt. It is rapidly cycled with a ramp rate of 4 T/s up to 2 T maximum field and a repetition frequency of 1 Hz. The superconducting coils of the Nuclotron-type magnets utilise a hollow cable cooled with a forced two phase helium flow. These coils must operate reliably over a period of at least 20 years and thus survive 2 · 10 load cycles. Intensive R&D is necessary to find the optimal solution preventing any possible damage of the coils by the fast pulsing loads over the life time taking into account the complex fine structure of the cable and coil designs as well as its sensitive influence on the field quality, AC loss generation and quench protection. We used FEM codes to analyse critical aspects of various design options and had manufactured coils for detailed mechanical tests. These tests on samples extracted from the coil are: thermal expansion measurements in all three directions on the cable package itself and its composite elements, compression tests and investigation of the Inter Laminar Shear Stress (ILSS). The stress strain behaviour of the cable package was measured along the transversal direction; the most important one to sustain the cycling load by Lorentz forces. A second sample was fatigue tested. Successful integral operation test results for the coil mechanics have been obtained within our first experimental runs on the prototype dipole magnets already started at GSI in the end of 2008.

Export citation and abstract BibTeX RIS

Please wait… references are loading.
10.1088/1742-6596/234/3/032013