This site uses cookies. By continuing to use this site you agree to our use of cookies. To find out more, see our Privacy and Cookies policy.
Brought to you by:
Paper

Design and construction of the MEBT1 for CADS injector scheme II*

, , , , , , , , , , , and

©2015 Chinese Physical Society and the Institute of High Energy Physics of the Chinese Academy of Sciences and the Institute of Modern Physics of the Chinese Academy of Sciences and IOP Publishing Ltd
, , Citation Huan Jia et al 2015 Chinese Phys. C 39 107003 DOI 10.1088/1674-1137/39/10/107003

1674-1137/39/10/107003

Abstract

A Medium Energy Beam Transport line 1 (MEBT1) has been designed for Injector Scheme II of the China ADS project. To match the beam from RFQ to Superconducting (SC) Half Wave Resonator (HWR) sections with emittance preservation, the MEBT1 has been designed to be mechanically compact. Working at 162.5 MHz, the MEBT1 transports a 10 mA, 2.1 MeV proton beam using seven quadrupoles and two bunching cavities within 2.7 meters. Three collimators are placed between every two adjacent quadrupoles to collimate the beam halo. Design and construction of the MEBT1 are presented in this paper.

Export citation and abstract BibTeX RIS

Footnotes

  • Supported by National Natural Science Foundation of China (11079001)

Please wait… references are loading.
10.1088/1674-1137/39/10/107003