Abstract
A pulsed low-energy positron system for positron-lifetime spectroscopy has been up-graded and modified with regard to its three main components. A new moderator preparation chamber has been added, the radiofrequency pulsing concept has been modified using a pre-buncher and a pre-chopper in front of the existing chopper-buncher section. Furthermore, a new target station allowing measurements at variable temperatures has been incorporated. The lifetime spectra now reveal a strongly increased ratio of peak to background and of peak to satellite peak.
Export citation and abstract BibTeX RIS