C Michotte et al 2010 Metrologia 47 06010 doi:10.1088/0026-1394/47/1A/06010
C Michotte1, S Courte1, G Ratel1, M Sahagia2, A C Wätjen2, R Fitzgerald3 and F-J Maringer4
Show affiliationsSince 2006, the Institutul de Fizica si Inginerie Nucleara – 'Horia Hulubei' (Romania), and the National Institute of Standards and Technology (USA) and the Bundesamt für Eich- und Vermessungswesen (Austria) have each submitted samples of known activity of 60Co to the International Reference System (SIR). The values of the activity submitted were between 180 kBq and 3.1 MBq. The key comparison results now include updated results for these three national metrology institutes with the identifier BIPM.RI(II)-K1.Co-60. The key comparison reference value has been re-evaluated following the recommendations of the CCRI(II) and the matrix of degrees of equivalence in the key comparison database now contains nineteen results as some very early results have now been excluded, identifier BIPM.RI(II)-K1.Co-60.
Main text. To reach the main text of this paper, click on Final Report. Note that this text is that which appears in Appendix B of the BIPM key comparison database kcdb.bipm.org/.
The final report has been peer-reviewed and approved for publication by the CCRI Section II, according to the provisions of the CIPM Mutual Recognition Arrangement (MRA).
Issue 1A (Technical Supplement 2009)
C Michotte et al 2010 Metrologia 47 06010
C Michotte et al 2010 Metrologia 47 06001
C Kessler et al 2009 Metrologia 46 06012
A Yunoki et al 2009 Metrologia 46 06014
C Kessler et al 2010 Metrologia 47 06007
P J Allisy-Roberts et al 2009 Metrologia 46 06013
C Michotte et al 2009 Metrologia 46 06010
P J Allisy-Roberts et al 2010 Metrologia 47 06003
C Kessler et al 2010 Metrologia 47 06004
P J Allisy-Roberts et al 2009 Metrologia 46 06011